Technical Reports
Writing of technical reports for installation projects, legalisation and energy subsidies. We gather the characteristics of the installation and prepare the technical documentation each procedure requires, ready to submit to the administration.
Technical design reports for electrical installations: summary
A technical design report is the document that describes a low-voltage electrical installation when regulations do not require a full engineering project. It records the characteristics of the installation, the justifying calculations, the earthing system and the single-line diagram, so the administration and the utility can verify compliance without visiting the site. It accompanies the installation certificate: one certifies the work, the other describes how it is built.
Whether a report is enough or a full project is required depends on the size, use and risks of the installation. Simple, lower-power installations are usually documented with a technical design report signed by a licensed installer, while larger installations or premises open to the public require a project signed by a qualified engineer, normally with site supervision on top. At Captia we review each case first, then draft the documentation the specific procedure demands: legalisation, grid connection or subsidy files.
Both routes stay in-house. Our engineers are chartered industrial engineers, so they draft and sign technical design reports, industrial projects and certificates alike; and Captia is entered in the Registro Integrado Industrial as a low-voltage installation company, so the electrical installation certificate that accompanies the file is issued under our own registration. This work is frequently split across three companies (the installer, the engineering firm that signs, and whoever handles the filing), and the threshold between a report and a project is precisely where such a file changes hands. Here it does not.
Typical business cases include legalising solar installations for self-consumption, power upgrades in industrial premises, regularising old installations together with electrical reports, and preparing technical documentation for energy grant applications. The report is delivered ready to submit, as part of the full cycle covered by Captia Energy.
The 20 kW threshold and filing in the Valencian Community
The line between a technical design report and a full project is not a judgement call: it is set by ITC-BT-04 of the Spanish low-voltage regulation (Real Decreto 842/2002). Its list of installations that require a project includes industry in general above 20 kW installed (the threshold that decides most industrial files), single-family homes above 50 kW, residential buildings and non-public commercial or office premises above 100 kW per general protection box, premises open to the public regardless of power, outdoor lighting and swimming pools or fountains above 5 kW, and, with no power limit, premises with fire or explosion risk and operating theatres. Below those thresholds the installation is legalised with a technical design report.
The choice changes who signs and which procedure applies. In the Valencian Community filing is electronic only, with the territorial industry, energy and mining service of the province (Orden 14/2022, of 5 December): procedure 440 (SIA code 210646) for installations documented with a technical design report, using the MTD form and MTDALEX for extensions, and procedure 434 (SIA code 210644) for those requiring a project, together with the site supervision and completion certificate (CERINSBT) and, where the project carries no professional-body endorsement, the technician's responsible declaration (DECRESTE).
What that really means is that crossing the threshold does not add pages, it adds a role: a qualified engineer who has to be present from the first drawing to the completion certificate. Our engineers are chartered, so they sign the project, and being on the professional register also keeps the endorsement route open: a technician who is not registered can only file under the responsible declaration.
Self-consumption generation follows its own route: procedure 18168 for installed power of 10 kW or below and procedure 20714 above that figure. In both, the commissioning notice is filed electronically by the authorised installer only, and the procedure also enters the associated consumer in the administrative register of electricity self-consumption. Identifying the right door before drafting the documentation is what prevents rewriting it halfway through.
Verified on 9 August 2026 against ITC-BT-04 of the low-voltage regulation (Real Decreto 842/2002) and the sede.gva.es records for procedures 440, 434, 18168 and 20714. Thresholds, codes and forms are updated periodically, so check the text and record in force before filing.
How it connects to the system
The energy layer connects to plant data via Connect and to interpretation and automation via AI.
Other solutions
- Solar Installations
Design, installation and commissioning of industrial and residential photovoltaic systems. We cover the full cycle: preliminary study, sizing, assembly, legalisation and connection, with the installation ready to be monitored and integrated into operations.
- Industrial Solar
Photovoltaic installations for companies and industrial plants with self-consumption, surplus management and integrated monitoring. The installation connects with operational data to give traceability between generation, consumption and production.
- Residential Solar
Solar installations for single-family homes and residential communities with intelligent energy management. We handle the study, the installation and the paperwork, with monitoring of consumption and generation to understand and adjust how energy is used.
Frequently asked questions
- What is a technical design report for an electrical installation?
- It is the document that describes a low-voltage electrical installation when regulations do not require a full engineering project. It records the characteristics of the installation, the basic calculations, the materials used and a single-line diagram, so that the administration and the utility can verify compliance. It is prepared and signed by a licensed installer or a qualified technician. At Captia it is drafted and signed by a chartered industrial engineer on our own team.
- When is a technical report enough and when is a full project required?
- It depends on the type of installation, its power and its use. Simple, lower-power installations are usually legalised with a technical design report, while larger installations, premises open to the public or installations with specific risks require a project signed by a qualified engineer. We cover both routes with the same team: our engineers are chartered, so they sign the technical design report and the full project alike, and crossing the threshold does not mean changing supplier midway. Before starting the procedure we review your case and tell you which document applies.
- Who signs the technical report?
- The technical design report is signed by whoever executes the installation, normally a licensed installer, or by a qualified technician when the case requires it. It carries technical responsibility: the signatory vouches that the document matches the real installation and current regulations. At Captia it is signed by a chartered industrial engineer on our team, and where the file also calls for the electrical installation certificate we issue it under our own low-voltage entry in the Registro Integrado Industrial.
- Can the technical report also be used for subsidies?
- The technical documentation of the installation is part of the file in many calls for energy installation grants, such as those managed by regional bodies. Each call sets its own documentary requirements, so we prepare the report and the rest of the technical documentation according to what the specific procedure demands.
- Above what power is a full project required instead of a technical report?
- ITC-BT-04 of the Spanish low-voltage regulation requires a project for industry in general above 20 kW installed, single-family homes above 50 kW, residential buildings and non-public commercial or office premises above 100 kW per general protection box, outdoor lighting and swimming pools above 5 kW, and premises open to the public regardless of power. Below those thresholds a technical design report is enough. Verified on 9 August 2026.